102 Lakeshore Boulevard

Building

Building 102 Lakeshore Boulevard

Kissimmee, FL, USA

Roy E Hansel Power Plant

Details

Icon-transparency Transparency

This building has a 5 year timeline with 2 green activities.

Timeline

Roy E Hansel Power Plant
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Roy E Hansel Power Plant
reported on 01/01/2012
GHG Emissions Reported
EPA GHG Reporting Program (2012)

Resources

Building Details

CBSA Orlando-Kissimmee-Sanford, FL
USGBC Chapter Central Florida Chapter
EPA Region Southeast
NHCS Urban Rural Classification Large fringe metro
Utility Provider Kissimmee Utility Authority
industry type sectors Power Plants
total reported direct emissions in metric tons co2e 26,284
note Emissions data reported to EPA as of 8/18/2014
ghg quantity reported metric tons co2 0
Report a Data Problem