GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

13515 South 150 East

Building

Building 13515 South 150 East

Draper, UT, USA

Channing Hall

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Channing Hall
reported on 01/01/2012
Solar Installed
The Solar Foundation National Solar Schools Census
Channing Hall
NCES Public Schools

Walk Score®: 46/100

Resources

Building Details

CBSA Salt Lake City, UT
USGBC Chapter Utah Chapter
EPA Region Mountains and Plains
ASHRAE Climate Zone ASHRAE Climate Zone #5
NHCS Urban Rural Classification Large central metro
Utility Provider PacifiCorp.
school level Primary
lowest grade taught Kindergarten
highest grade taught 8th Grade
school type Regular School
charter school Yes
operational status Open
total enrollment 663
solar capacity kw 5.28
system type PV
year installed 2012
installer Johnson Controls
primary funding type Grant/Donation
lowest grade Kindergarten
highest grade 8th Grade
total students 642
Report a Data Problem