Loading Dock & Parking Garage Entrance

Building

Building Loading Dock & Parking Garage Entrance

180 CityPoint, 180 3rd Ave, Waltham, MA, USA

180 Third - 1st Floor Lab Fitout

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

180 Third - 1st Floor Lab Fitout
registered on 05/28/2024
Registered
LEED v4 ID+C CI

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded
Space Type(s) Laboratory
CBSA Boston-Cambridge-Quincy, MA-NH
USGBC Chapter Massachusetts Chapter
EPA Region New England
NHCS Urban Rural Classification Large fringe metro
Report a Data Problem