Equinix Data Center

Building

Building Equinix Data Center

Dubai Production Ci, Dubai, AE, 00000, AE

Equinix DX3.1

Details

Icon-transparency Transparency

This building has a 2 year timeline with 2 green activities including a LEED Silver certification.

Timeline

Equinix DX3.1
awarded on 12/13/2023
Silver
LEED v4 BD+C DC
Equinix DX3.1
registered on 09/11/2022
Registered
LEED v4 BD+C DC

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Datacenter
Report a Data Problem