Winnemucca

Building

Building Winnemucca

209 Railroad Street, Winnemucca, NV, USA

Ruby Pipeline-Desert Valley Station

Details

Icon-transparency Transparency

This building has a 4 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Ruby Pipeline-Desert Valley Station
registered on 02/11/2009
Registered
LEED NC 2.2

Resources

Building Details

Owner Type(s) Profit Org.
Space Type(s) Other
USGBC Chapter Nevada Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Noncore (nonmetropolitan)
Report a Data Problem