GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

4000 Dauphin St

Building

Building 4000 Dauphin St

Mobile, AL, USA

Spring Hill College Campus Center

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Silver certification.

Timeline

Spring Hill College Campus Center
registered on 01/25/2008
Registered
LEED NC 2.2

Walk Score®: 38/100

Resources

Building Details

Owner Type(s) Profit Org., Non-Profit Org.
Space Type(s) Higher Ed
CBSA Mobile, AL
USGBC Chapter Alabama Chapter
EPA Region Southeast
ASHRAE Climate Zone ASHRAE Climate Zone #2
NHCS Urban Rural Classification Medium metro
Utility Provider Alabama Power Co.
Report a Data Problem