GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

31 Ivy St

Building

Building 31 Ivy St

Chico, CA, USA

CSU Chico Science Building

Details

Icon-transparency Transparency

This building has an 8 year timeline with 2 green activities including a LEED Silver certification.

Timeline

CSU Chico Science Building
awarded on 08/20/2024
Silver
LEED v4 BD+C NC
CSU Chico Science Building
registered on 12/11/2017
Registered
LEED v4 BD+C NC

Walk Score®: 89/100

Resources

Building Details

Owner Type(s) Educational: College, Public
Space Type(s) Higher Ed
CBSA Chico, CA
USGBC Chapter Northern California Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Small metro
Report a Data Problem