62300 Jewell Road

Building

Building 62300 Jewell Road

Washington, MI, USA

Romeo Engineering Technology Center, Romeo Engineering And Technology Center

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Romeo Engineering And Technology Center
reported on 01/01/2010
Solar Installed
The Solar Foundation National Solar Schools Census
Romeo Engineering Technology Center
NCES Public Schools

Resources

Building Details

CBSA Detroit-Warren-Livonia, MI
USGBC Chapter Detroit Regional Chapter
EPA Region Great Lakes
ASHRAE Climate Zone ASHRAE Climate Zone #5
NHCS Urban Rural Classification Large fringe metro
Utility Provider Detroit Edison Co.
lowest grade taught 9th Grade
highest grade taught 12th Grade
school type Reportable Program
charter school No
operational status Closed
solar capacity kw 19.80
system type PV
year installed 2010
panel manufacturer Schott
primary funding type Grant/Donation
Report a Data Problem