1 Maverick Way

Building

Building 1 Maverick Way

Carlsbad, CA, USA

La Costa Canyon High

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

La Costa Canyon High
reported on 01/01/2011
Solar Installed
The Solar Foundation National Solar Schools Census

Resources

Building Details

CBSA San Diego-Carlsbad-San Marcos, CA
USGBC Chapter San Diego Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Large central metro
Utility Provider San Diego Gas & Electric Co.
solar capacity kw 1,000.00
system type PV
year installed 2011
installer Chevron Energy Solutions
primary funding type Grant/Donation
installed cost $3,250,000.00
costwatt $3.25
lowest grade 9th Grade
highest grade 12th Grade
total students 2,478
Report a Data Problem