791 Ridder Park Dr

Building

Building 791 Ridder Park Dr

San Jose, CA, USA

Supermicro Green Park Phase 2

Details

Icon-transparency Transparency

This building has a 7 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Supermicro Green Park Phase 2
registered on 12/24/2015
Registered
LEED NC 2009

Walk Score®: 57/100

Transit Score®: 0/100

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded
Space Type(s) Industrial Manufacturing
CBSA San Jose-Sunnyvale-Santa Clara, CA
USGBC Chapter Northern California Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Large central metro
Utility Provider Pacific Gas and Electric Co.
Report a Data Problem